Specialised Environmental Solutions
Stormwater Harvesting & Wetland Construction
client
Inner West Council
location
Blackmore Oval, Leichhardt
Construct new stormwater offtake pit from existing stormwater canal
New electrofusion pumplines
Electrical & comms installation
Install treatment shed including pipework & control system
Install 60,000L recycled water storage tank
Construct new footpath, pedestrian bridge & Wetland viewing path
Decommission existing & construct new Wetland
Trash Rack & Rockwall Construction
client
Willoughby Council
location
Willoughby
Remove existing trash screen
Excavate & extend offline catchment area
Construct new rock wall to blend GPT in with natural surroundings
Access path construction
Trash screen installation
GPT Installation & Integration into Stormwater System
client
Private
location
Marsden Park
Excavate & install shore box
Install CDS unit & pre cast diversion chamber
Form & pour cast insitu end walls and weir
Install 1800mm precast junction pit
1200mm RCP pipe lines
Gross Pollutant Trap Installation
client
Dubbo Regional Council
location
Bultje St. Dubbo
Excavate & batter works area
Expose & cut 2 x existing Council stormwater mains
Install HUMEGUARD HG 40L
Form & pour 2 x diversion junction pits
New 375mm RCP stormwater lines
Access riser and step irons installation
Backfill & compaction of works area
Removal of excess spoil from site
Gross Pollutant Trap Installation & Access Driveway
client
Hornsby Shire Council
location
Sherbrook Rd. Hornsby
Demolish existing stormwater culvert
Rocksawing & excavation for CDS unit
Install CDS Unit P1518 (Double Depth Sump)
Form and pour diversion chamber
Form & pour suspended slab
New access driveway (250m2)
Gross Pollutant Trap Installation & Access Driveway
client
Lane Cove Council
location
Lane Cove
Rocksawing & excavation
Install CDS unit & precast diversion chamber
Insitu concrete works
Install “Grasspave” access driveway.